June 7, 2020

ISS Daily Summary Report – 2/19/2020

By Bill Keeter Dose Distribution Inside the ISS – 3D (DOSIS 3D): As a continuation of the troubleshooting, the crew swapped the DOSTEL-1 and DOSTEL-2 data cables inside the DOSIS Main Box, then checked status of the DOSIS LEDs, and removed the DOSTEL-1 if needed. This experiment uses active and passive detectors to determine the radiation doses inside …

Source:: ISS Status