October 1, 2020

ISS Daily Summary Report – 6/15/2020

By Bill Keeter Payloads REDEYE: The crew installed the RED-EYE 2 satellite onto the Japanese Module (JEM) KABOR deployer system on the JEM Airlock slide table. The crew also replaced the old capture mechanism with a new unit and took the multilayer insulation (MLI) from the old unit and installed it onto the new capture mechanism unit. The …

Source:: ISS Status